INTERNATIONAL OPEN BID TO HIRE CAPACITY AND ELECTRIC ENERGY FOR THE USERS OF GUATEMALAN DISTRIBUTION COMPANIES DEOCSA, DEORSA AND EEGSA

 


Awarded Companies

Company
Power Bid (MW)
Max Power (MW)
Category
Offered Power Price (US$/KW-month)
Offered Energy Price (US$/MWh)
Price O&M (US$/MWh)
Type of contract
Instituto Nacional de Electrificación, INDE
75.00
79.425
Hydro
7.90
72.80
7.28
Difference with load curve
Vehículo de Contratación de Energía, S. A.
6.57
10.90
Hydro
45.02
20.13
2.01
Opción de Compra de energía
Vehículo de Contratación de Energía, S. A.
8.00
8.55
Hydro
40.07
20.57
2.05
Opción de Compra de energía 
Generadora Nacional, S.A.
24.00
40.00
Hydro
8.90
79.83
7.98
Difference with load curve
Generadora Nacional, S.A.
10.00
21.00
Hydro
8.90
81.11
8.11
Difference with load curve
Hidro Xacbal, S. A.
60.00
97.053
Hydro
8.90
90.00
9.00
Difference with load curve
Hidroeléctrica El Cóbano, S. A.
8.36
10.00
Hydro
13.31
85.55
8.55
Difference with load curve
Hidroeléctrica Tres Ríos, S. A.
4.99
14.00
Hydro
8.00
89.10
8.91
Difference with load curve
Agropecuaria Altorr, S. A.
N/A
1.50
Hydro
N/A
91.67
18.33
Generated Energy
Arrendamientos Industriales, S.A.
N/A
2.00
Hydro
N/A 
78.95
15.79
Generated Energy
Arrendamientos Industriales, S.A.
N/A
2.98
Hydro
N/A 
94.31
18.86
Generated Energy
Hidroeléctrica Samuc, S. A.
N/A
0.84
Hydro
N/A 
95.83
19.16
Generated Energy
Agroprop, S.A
N/A
0.98
Hydro
N/A 
97.92
19.58
Generated Energy
El Sarral, S. A.
N/A
2.40
Hydro
N/A 
99.00
19.80
Generated Energy
Xolhuitz Providencia, S. A.
N/A
4.00
Hydro
N/A 
94.95
18.89
Generated Energy
Total
196.92
 

Click para ampliar

On Monday, February 13, 2012, the economic offers of the participants in the bid were opened. The media was invited for the event. The final numbers were projected for all the audience to see. The Qualifying Committee will anounce the awarded firms on March 8. Here is a picture of the audience in the event.


Click for a panoramic view of the event

33 offers were presented on Thursday, January 26, 2012, to participate in the Open Bid PEG-1-2010.

Download the summary of offers.

Summary by generation site

Summary of economic offers


The Indicative Expansion Plan of the Generation System, which is part of the energy policies of the Republic of Guatemala, established the need to transform the current energy matrix to be able to generate energy through at least 60% of renewable generation resources by 2022.

Part of the actions of CNEE to achieve such Indicative Plan, is to approve the Terms of Reference for Open Bid PEG-1-2010, which seeks to promote competitive prices in the purchases of capacity and energy for distribution companies. This will benefit final users who are or are not affected by the Social Tariff Law, after large scale purchases of capacity and electric energy.

It has been agreed that Distributors will carry out a bidding process to aggregate their capacity and energy needs to be covered by the resulting contracts. This will also increase the number of potential investors, take advantage of renewable energy sources, dispersed all over Guatemala and to use more efficient technologies in the production of energy.

Your questions can be addressed to:

Junta de Licitación PEG-1-2010/EEGSA
6ª. Avenida 8-14 zona 1 de la ciudad de Guatemala
Tel: (+502) 2230-0659
Correo Electrónico: crodas@eegsa.net

Junta de Licitación PEG-1-2010/DEOCSA-DEORSA
10 Avenida 14-14, zona 14 de la ciudad de Guatemala
Tel: (+502) 2367-9407
Correo electrónico: dcarranza@uef.com.gt


The terms of reference (Spanish only) of the open bid can be downloaded in this link:

Terms of Reference in English

In Spanish: Modification to the Terms of Reference, Resolución CNEE-192-2011

In Spanish: Q&A series, first part

In Spanish: Q&A series, second part

In Spanish: Q&A series, third part

In Spanish: Q&A series, fourth part

In Spanish: Q&A series, fifth part

In Spanish: Q&A series, sixth part

So far the terms of reference have been purchased by a number of companies. Download the list of companies here.

The call for bids has been published in the local newspapers. Click on the next graphic to zoom in (in Spanish):

Click para ampliar

This invitation states the following:

Empresa Eléctrica de Guatemala, S. A. (EEGSA) and UNIÓN FENOSA DEOCSA-DEORSA invite all generating companies interested in the bidding process of energy and power, for the electricity supply for users of the final distribution service during the 2015 to 2030 period.

Companies interested in acquiring the bidding documents shall contact Empresa Eléctrica de Guatemala, S. A. (EEGSA), 6ta. Avenida 8-14, Zona 1, Guatemala City or Unión Fenosa Deocsa-Deorsa, 10 Avenida 14-14, Zona 14 Guatemala City, and pay the amount of fifteen thousand US dollars (U.S.$ 15,000.00). The Distributed Renewable Generating Companies who qualify as such under current regulations, will pay the amount of one thousand US dollars (U.S.$ 1,000.00).

In both cases, when picking up the bidding rules, the company must appoint an authorized representative, and state a physical address, email address, telephone and fax number within the perimeter of Guatemala City.

The authorized representative must be fully empowered to:

a) Receive notifications and communications on behalf of the interested company.
b) Make inquiries, comments or requests of clarification and modification of bidding rules on behalf the interested entity.

The bidding rules will be available to interested companies from February 7, 2011 to October 27, 2011, Monday through Friday, from 8:00 to 13:00 and 14:00 to 16:00.


Here is the schedule for Open Bid PEG 1-2010:

Event

Date

Acquisition of Terms of Reference

From publishing date of the call for bids until one day before the presentation of tenders date

First information meeting

April 27, 2011

Second information meeting

August 5, 2011

Third information meeting
December 09, 2011

Deadline to send clarification requests about the Terms of Reference

December 27, 2011

Deadline to answer the clarificacion requests about the Terms of Reference and for publishing Addenda to the Terms of Reference

January 05, 2012

Delivery of the Technical and Economic Bid documents. Opening of the Techical Bid documents

January 26, 2012

Opening of the Economic Bid documents

Fabruary 13, 2012

Award date

March 08, 2012

Deadline for the signing of each supply contract

April 30, 2012


Guatemala wins first place award among
best 75 infrastructure projects in Latinoamerica

During the 9th Annual Latin American Leadership Forum held in Rio de Janeiro, Brazil, in May 2011, Guatemala won the award in the category of "Best Engineering Project of the Year" for the Electricity Generation Project PEG-1-2010. The nominees were:

  • São Sebastião Port Expansion (Brasil)
  • Trans-Andean Railroad Project (Argentina/Chile)
  • Electricity Generation Project PEG-1-2010 (Guatemala)

The nominees were published in Revista Fator in Brazil and the PR Newswire website, among others. A list of projects can be seen in CG/LA Infrastructure.

According to Revista Fator, "the nominees for Engineering Project of the Year are recognized by the production of plans that reinforce regional competitiveness for the next decades. The projects in this category have an associated technical difficulty superior to other projects, which makes their implementation a great challenge and conquest".


The bidding process was officially launched on February 14, 2011. This open bid seeks to hire 800 MW of guaranteed capacity for the users of distributors EEGSA and DEOCSA-DEORSA, for a period of 15 years, starting on May 2015. Download the official presentation (in Spanish) of Open Bid PEG 1-2010.


Download the documentos that describe the Expansion Plans from our library.
Please note that some documents have only been published in Spanish.

Perspectivas de mediano plazo (2010-2015) Planes de Expansión (Español) Expansion Plan (English)

 

 

 

 
 

Copyright 2011 Comisión Nacional de Energía Eléctrica

4 Avenida, 15-70 Zona 10, Edificio Paladium, Nivel 12

Ciudad de Guatemala, Guatemala

Tel: +502 2321-8000, Fax: +502 2321-8002, e-mail: cnee@cnee.gob.gt

Web design by www.cnee.gob.gt